342 Live Notices for Sub-Saharan Africa water and sanitation tenders
Showing 1 to 20
Supply, delivery and off-loading of submersible axial flow pumps at the Waste Water Treatment Works (WWTW), as and when required for a period of three years
Repair and maintenance of various mechanical equipment on the city of Tshwane’s wastewater treatment works (WWTW), as and when required for a three (3) year period.
Providers for the hire of the mobile drinking water tankers (trucks) with the loading capacity of between 10 000 to 15 000 litres of water for the supply in the informal settlements in the city of Tshwane for the period of three (3) years as and when required.
REHABILITATION AND UPGRADING OF 2 EARTHDAN RAIN WATER HARVSETING SYSTEM MAKINEY AND WARWINEY IN BAIDOA .
Proposed Extension of Borama Water Supply Project
DESIGN, SUPPLY, INSTALLATION AND COMMISIONING OF CHLORINE DIOXIDE DOSING SYSTEMS AT MALATSWAE, THABALA AND REPLACEMENT AT MOTSHEGALETAU IN SEROWE SERVICE CENTRE
Rehabilitation work on forty-two (42) drinking water supply systems in the Boucle du Mouhoun and Hauts-Bassins regions for the benefit of the Program Water Supply and Sanitation (PAEA).
Design, Supply, Installation, Testing and Commissioning of a 2 MWac Floating Solar Power Plant at Tamarind Falls Reservoir
Construction of Services: Gravitational Sewer Line with 10 Manholes at Tallismanus
Construction of Services at Aminius - Upgrading of Server Pump Stations and Cleaning of Sewer Lines
Procurement for implemented by a Consortium of four (4) structures (AEN Sahel, CORDAID, TASSAGHT and AGRICAP-Mali) with AEN Sahel as leader.
Re-Advert: Operation And Maintenance Of The Bethal Waste Disposal Site For A Period Of 36 Months
Construction Of Thabana Sewer Outfall Reticulation Precast Toilets And House Connections: Phase-2: Ward No.7
Construction Of Gaphaahla Sewer Outfall, Sewer Reticulation And Precast Toilets Phase 3
Replacement Of Asbestos Bulk Line From Water Treatment Plant To Bloedfontein Reservoir Phase 3
Re-Advert: Operation And Maintenance Of The Kinross Waste Disposal Site For A Period Of 36 Months
Appointment For A Panel Of Consulting Engineers (Water, Sanitation, Waste Management, Town Planning, Roads And Storm Water Drainage And Electrical, Structural) For A Period Of 36 Months.
Replacement Of Asbestos Bulk Line From Water Treatment Plant To Kuilen Reservoir Phase 2
Supply Of Material And Fittings For Rehabilitation Of Mix Chamber At University Reservoir
Rfp For Baseline Study, Data Collection & Validation For The Government'S Water Supply Schemes In Sierra Leone Open New Window