136 Live Notices for Taiwan oil and gas tenders
Showing 1 to 20
Diesel Injection Pump Test Bench Maintenance
Process Gas Online Analysis Platform
Light Crude Oil Fractionation Plant_E-1341 S31803 Fin Seamless Stainless Steel Heat Exchange Tube
Entrusted Technical Services For The Disaster Recovery And Construction Project Upstream Of Nanxing Bridge In Linmei River, Nanfeng Village, Renai Township, 2013 Typhoon G1-014
Maintenance And Management Of River Defense Structures In The Lower Reaches Of Zhuoshui Creek In 2014 (Upstream Of Yunlin County) (Open Contract)
Tainan City Liucuo Drainage Midstream Box Culvert Interception And Function Improvement Project
Xiaogang Factory Soybean Crude Oil 1,000,000Kg
Maintenance And Management Work On The Left Bank Of The Upstream And Downstream Left Banks Of The Donggang River Chaozhou Bridge In 2014
In 2014, Hualien County Promoted Water Pollution Prevention And Control, High Organic Pollution Waste Water Resource Utilization, Water Pollution Source Inspection And Control, Green Energy Biogas Recycling And Odor Reduction Coaching Plan
North Uk Drainage (Upstream And Downstream Of Hougang Bridge) Revetment Improvement Emergency Works
Maintenance And Management Work Of Embankment Structures In The Upper Reaches Of Wuxi (Upstream Of Wuxi Bridge) In 2014 (Open Contract)
Environmental Science Group And Geochemistry Group Gas Chromatography Related Equipment And Consumables
Fangyuan Township Bazhou Drainage Branch Line (Upstream Of Provincial Line 17) Bank Protection Improvement Project
Maintenance And Management Work Of Embankment Structures In The Lower Reaches Of Wuxi (Downstream Of Wuxi Bridge) In 2014 (Open Contract)
Monitoring Of Shigangba Fishway And Its Upstream And Downstream Biological Resources In 2014
Procurement Of Gas Fuel Supply For Staff Restaurants In Binjiang Area Of Our Main Station From 114 To 116
Tongxiao Power Plant Phase Ii Renovation And Reconstruction Plan Submarine Gas Pipeline Turnkey Project Procurement Case
113 Maintenance And Improvement Project Of The Left Bank Protection On The Downstream Side Of Jinyi Bridge In Kouai River
Gasoline Official Car Rental Case In 2014
114-Year Long-Term Contract Work For Non-Destructive Testing Of Peach Refining, Transportation, Storage And Related Facilities