59 Live Notices for Vietnam airports tenders
Showing 1 to 20
Property Insurance Air Traffic Management Engineering Company Limited 2025
Package No. 5.11: Construction, Installation And Supply Of Airport Management System Equipment
Adjusting The Contractor Selection Plan For A Number Of Packages Of Component Project 3 - Essential Works In The Airport Under The Long Thanh International Airport Construction Investment Project Phase 1
Investing In Upgrading The Baggage Handling System And Scanners At The Level 5 Baggage Check Area Of Passenger Terminal T2 - Noi Bai International Airport
Purchase Of Equipment For Taxiway Lighting System At T3 Passenger Terminal - Tan Son Nhat International Airport
Renovation And Repair Of Stop Bar Light Cluster On Taxiway P6
Contractor Selection Plan For The Project "Repair Of Runways And Taxiways - Vinh International Airport"
Providing Periodic Inspection Services For Pressure Equipment And Lifting Equipment For Huoi Quang - Ban Chat Hydropower Company In 2025
Repair And Level The Taxiway Strip Of Taxiway V (From Berth 88 To Guard Post 20) And The North Shoulder Of Runway 25R/07L; Level, Compensate For Subsidence, And Reinforce The Concrete Foundation Of The Structures Within The Runway Strip.
Purchase Materials To Ensure Officers And Soldiers Participate In Guarding And Protecting The Airport Construction Site In Gia Binh District.
Purchase Replacement Materials For Damaged Materials At Noi Bai Air Traffic Control Station And Phu Cuong Information Station
Property Insurance Air Traffic Management Engineering Company Limited 2025
Plan For Selecting Contractors For Consulting Packages To Adjust Component Project 2 - Construction Of An Airport Under The Sa Pa Airport Construction Investment Project, Lao Cai Province Under The Public-Private Partnership (Ppp) Method
Providing Satellite Bandwidth For Vsat Information Network Of Vietnam Air Traffic Management Corporation
Plan To Select Contractors For The Project Of Building White Fire-Proof Runways For The Dry Season 2024 - 2025, Area 15,852 Ha, Implemented In 2024
Contractor Selection Plan For The Project: Building A White Fire-Proof Runway For The 2024-2025 Dry Season, An Area Of 13,074 Hectares, To Be Implemented In 2024.
Maintenance Of Fire Protection System Of Aviation Museum, Building A, Building B, Vietnam Air Traffic Management Corporation
Road Markings For Runways, Taxiways, And Aprons - Vinh International Airport
Selecting Contractors For Packages Of The Project: Maintenance And Patching Of Damaged Runways And Taxiways - Chu Lai Airport
Contractor Selection Plan For The Project "Maintenance And Patching Of Runway System And Taxiways (Itinerary H10+00 To H11+00; From H13+00 To H13+60; From H19+00 To H19+50; From H23+00 To H24+00)"