336 Live Notices for Vietnam bridges tenders
Showing 1 to 20
Shopping 01 7 -Seat Car, 01 Bridge, Engine 3.5, Petrol Engine For Production And Business Of The Corporation In Hanoi
Package No. 07: Construction Of Works: Sidewalk Brick Lining And Road Drainage System 30/4, Pineapple 1, Dam Doi Town (West) (Section From Tran Van Phan Street With Road 30 /4 To Thay Chuong Bridge)
Package No. 01: Construction Of Repair Works Of Damage To Po Can Bridge (Km33+205); Gum (Km57+360), Ql.1B, Lang Son Province
Package No. 05: Construction Of Works Under The Project: Upgrading And Expanding The Roads Of Gtnt From Home Bridge To Ba Dinh Bridge
Package No. 04: Construction Of Works Under The Project: Construction Of Lu Gtd Route From Seven Boats - Tu Village Bridge, Hoa Tan Commune
Package 5: Survey, Design Construction Drawings And Construction Estimates For The Project: Upgrading The Embankment Combined With Rural Roads (Starting From Mai Dam Open Culvert To Kenh Dao Bridge); Restoring The Technical Infrastructure Of The Water Supply System; Ensuring Waterway Traffic Safety For Construction.
Repair Channel N19, Location: K0+820 & Refresh The Bridge Via N19 Channel, Location: K1+190 - Bac Canal - Irrigation Irrigation System, Bac Ai District, Ninh Thuan Province
Road Dx.06 (Section From The Suspension Bridge Of Dinh Trung Commune To Binh Trung Bridge), Dinh Trung Commune, Phase 1, Binh Dai District
Plan For Selecting Construction Contractors: Exciting Garbage, Obstacles On Tien Hung Canal (In Front Of The Old Nguyen Bridge Area And In Front Of Dinh Thuong Bridge) In 2025
Repair Damage To The Background, Road Surface Km504+850 - Km505+260, Km505+380 - Km505+810, Km506+936 - Km507+250, Km507+500 - Km507+790, Km511+650 - Km512+00, Km536 +950 - Km537+600, Km561+100 - Km561+450, Km569+200 - Km570+250, Km571+150 - Km572+160; Repairing Grooves Along The Segment Of Km537+950 - Km538+100 (P); Km547+630 - Km547+850 (P); Km547+630 - Km547+780 (T); Km547+970 - Km548+150 (P); Km547+980 - Km548+315 (T); Repairing Bridges: Quang Trung Km512+430, North Km566+065, Hóa Km573+974, Don Km582+864, Member Ii Km585+748, Ben Da Km586+163, Green River Km590+256, Thuong Ninh I Km591+160, Cu Duc Km591+852, Yen Cat Km600+416, Beds Km604+094, Copper Chili I Km602+718, Copper Chili Ii Km603+096, Preliminary Leaves Km608+818, Ct04 Km631+644; Repairing The System Of Signs And Strengthening The Traffic Safety System On The Highway Passes Through Schools From Km503+00 - Km632+600; Repairing Lighting System Km521+00 - Km524+420, Km541+430 - Km543+200, Km565+500 - Km565+800, Ho Chi Minh Road. Repairing Signs Km0+00 - Km0+643 Branch 1, Km0+00 - Km0+506 Branch 2, Km0+00 - Km0+409 Branch 3, Km9+00 - Km54+540; Strengthen The Traffic Safety System On The Highway Passing The School Paragraph Km20+500 - Km54+450, The Road Connecting Nghi Son - Ho Chi Minh Road (Bai Trang), Thanh Hoa Province
Nam Tra Village Bridge In Gia Phu Commune (On Nam Tra - Nam Flat), Bao Thang District
Phu Thinh 2 Village Bridge (Near Mrs. Huyen'S House) And Phu Thinh 3 Village Bridge (Near Mr. Hoa'S House, Mr. Man), Phu Nhuan Commune, Bao Thang District
Maintenance And Repair Of The Lighting System Of National Highway 91 (The Section From The Young Can Tho Bridge To The Fragrant Bridge)
Machining The Technology Of C245 Warehouse Transfer, C148 And C184 Warehouse A, Tau Bridge Support Pillow 2-3A
Regarding The Approval Of The Project Contractor Selection Plan: Move The Power Line To Clear The Project Of Investment Project To Build Tan An Bridge And The Link Connecting Highway 18 Of Chi Linh City, Hai Duong Province
Plan For Contractor Selection Phase Investment In The Item: Construction Of Resettlement Area And Land Allocation With Land Use Levy Collection Of Hop Tien Commune To Serve The Project Site Clearance: Investment In Construction Of Kenh Vang Bridge And Link Hai The Bridge Head, Connecting The Two Provinces Of Bac Ninh And Hai Duong
The Entire Volume Of Construction And Installation Of Vinh Loc Trough Bridge
Building Hdpe D710 Transmission Pipeline From Cam Giang Station To Ghe Bridge - Kdns Branch No. 10
Contractor Selection Plan For The Preparation Phase Of Project Investment: Gtnt Bridge Is Ca A
The Contractor Selection Plan For The Implementation Phase Of The Project: The Hamlet Government Bridge Is Ca A