48 Live Notices for Vietnam tunnels tenders
Showing 1 to 20
Contractor Selection Plan For The Package Of Digging And Cutting Tunnels At Level -175/-110 Of Seams 13, 14 Of Tt Area And Clearing Level -300/-175 Of Dn Area
Construction Of Tunnel Through Cu Hin Mountain Connecting From Lo River, Phuoc Dong Commune - Nha Trang To Cam Hai Dong Commune - Cam Lam (Pre-Feasibility Study Report Preparation Step)
Underground Telecommunication Network On Le Thi Rieng Street. Item: Sewer Tunnel
Underground Telecommunication Network On Huong Lo 80B Route - Item: Sewer Tunnel
Contractor Selection Plan For The Preparation Phase Of The Long Phuoc Tunnels Relic Exhibition Area Project
Materials For Tunnel Construction Basic Construction
Hire The Tunnel Excavation Stage To Prepare For Production In Area V6A At Level +50/+100 T.I-:-Rg And Area V7T At Level +30/+125 T.V-:-F.305 (Phase 1)
Package: Hire The Tunnel Excavation Stage To Prepare For Production Level -10 -:- -175 Gieng Vang Danh Area
Underground Telecommunication Network On Le Thi Rieng Street. Item: Sewer Tunnel
Contractor Selection Plan For The Preparation Phase Of The Long Phuoc Tunnels Relic Exhibition Area Project
Outsourcing Of Tunnel Excavation Cbsx In 2025 Package No. 03 Tunnel Excavation Lines Connecting Zone Iv-V6
Outsourcing Of Tunnel Excavation Cbsx 2025 Package Number 02 Tunnel Excavation Lines To Clear Seam 10 And Improve Transportation Capacity
Railway Underpass Connecting Phu Long Urban Area With The Urban Area Behind The Left Bank Of The Red River, Pho Lu Town, Bao Thang District
Railway Underpass Connecting Phu Long Urban Area With The Urban Area Behind The Left Bank Of The Red River, Pho Lu Town, Bao Thang District
Providing Public Career Services For Management, Operation And Maintenance Of Saigon River Tunnel Structure And Equipment (Unscheduled Repair Of Saigon River Tunnel Structure And Equipment System In 2024 - Procurement Of Materials For Urgent Repair Of Saigon River Tunnel Structure And Equipment System - Phase 3)
Outsourcing Tunnel Excavation Cbsx 2025 Package Number 01 Tunnel Excavation Lines Connecting V7-V6
Constructing A Ø200 Master Meter Tunnel In Front Of 226A Pasteur, Vo Thi Sau Ward, District 3 To Regulate Pressure For Dma 3F-02B And Dma 3H-03
Major Repair Project Of Yen Vien Engine Inspection Tunnel Preparation House - Hanoi Locomotive Enterprise
Renovating And Upgrading Rural Traffic Routes From Tl325B Through The Pipeline To The Underpass Of The Expressway In Zone 16, Tien Kien Commune
Project Contractor Selection Plan: Route From The Highway Underpass To Kho Gao Road, At Group 4, Zone 6, Viet Hung Ward, Ha Long City