168 Live Notices for Vietnam gis gps tenders
Showing 1 to 20
Package 4: Providing Construction Survey Consulting Services, Preparing Construction Designs To Be Implemented After Basic Designs, Construction Drawings And Construction Documents; Cost Of Applying Building Information Modeling (Bim); Extracting Cadastral Maps, Preparing Documents For Land Recovery And Land Lease Procedures
Hire Geophysical Equipment Maintenance And Repair Services (According To Order Number Dvn-Dv-4363/24-Dvl-Tth)
Hire Geophysical Equipment Maintenance And Repair Services (According To Order Number Dvn-Dv-4363/24-Dvl-Tth)
Plan To Select Contractors For The Survey Package, Prepare Cadastral Map Extracts To Reclaim Land For Project Construction: Renovation And Upgrading Of The Road From Old National Highway 37 To The Gate Of Warehouse Kv2, Kim Phu Commune, Tuyen Quang City
Supply of spare parts to replace damaged measuring and control equipment throughout the Factory
Surveying And Mapping Cadastral Maps, Establishing Cadastral Records, Granting Certificates Of Land Use Rights, House Ownership Rights And Other Assets Attached To Land For Households And Individuals.
Package: Cost Of Measuring, Extracting And Correcting Cadastral Maps, Phase 3, 2025
Package No. 05: Survey, Measurement And Topographic Mapping At Scale 1/2,000
Package Tv-01: Consulting On Topographic And Geological Surveys, Preparing Feasibility Study Reports
Package No. 04: Consulting On Planning Documents According To Geographic Information System (Gis)
Measuring Cadastral Maps, Preparing Dossiers For Granting And Changing Certificates Of Land Use Rights For Production (Area Assigned To The Implementation Phase Of Decision No. 08/2007/Qd-Ttg Dated January 12, 2007 Of The Prime Minister) For Households Resettled In The Tuyen Quang Hydropower Project In Ham Yen District.
Package 1: Consulting On The Preparation Of The 1/500 Scale Tmb Planning, Topographic And Geological Surveys, And Preparation Of A Feasibility Study Report (With The Application Of Building Information Modeling (Bim))
Consulting On Technical Design And Construction Cost Estimates To Complete The National Geographic Database And National Topographic Map At Scale 1:2000 In Hai Duong Province.
Approval Of Budget And Contractor Selection Plan For The Package To Purchase Gnss Receiver Pnr21
Adjusting The Digital Map Of Concentrated Production Areas, Specializing In Key And Typical Agricultural Products; High-Tech Agricultural Production Areas In Bac Giang Province According To Decision No. 100/Qd-Ubnd Dated January 18, 2023 Of The Chairman Of The People'S Committee Of Bac Giang Province.
Hire Geophysical Equipment Maintenance And Repair Services (According To Order Number Dvn-Dv-4363/24-Dvl-Tth)
Contractor Selection Plan: Determining Field Boundaries And Extracting Cadastral Maps To Serve The Work Of Handing Over Land Plot Boundaries To Customers Who Won The Auction For Residential Land Use Rights In Area Lk01, Van Dinh Town, Ung Hoa District, Hanoi City.
Determining Land Use Boundaries, Measuring And Correcting Cadastral Maps, Establishing Land Use Boundary Records, And Granting Land Use Right Certificates To Land Users Originating From Forestry Farms In Kon Tum Province (Phase 3).
Contractor Selection Plan For Package 06: Setting Up Boundary Markers For Site Clearance Work And Package 07: Extracting Cadastral Maps At Scale 1/500, Preparing Technical Documents For Land Plots For Site Clearance Work Under The Project: Construction Of Technical Infrastructure For Residential Areas In The Center Of Hien Ninh Commune (Area 1)
Contractor Selection Plan Bidding Package: Cost Of Measuring, Extracting And Correcting Cadastral Maps, Phase 3, 2025 Belonging To The Projects: 1. Improving The Reliability Of 35Kv Medium Voltage Grid Power Supply Between Dz 377E15.7 (Ben Thuy 110Kv Substation) And Dz 375E15.43 (Hung Nguyen 110Kv Substation); Between Dz 371E15.43 (Hung Nguyen 110Kv Substation) And Dz 373E15.1 (Hung Dong 220Kv Substation) According To The Multi-Split - Multi-Connection Plan. 2. Improving The Reliability Of Medium Voltage Grid Power Supply (35Kv) Between Dz 377E15.7 (Ben Thuy 110Kv Substation) And Dz 373E15.15 (Nam Dan 110Kv Substation); Between Dz 373E15.1 (220Kv Hung Dong Substation) And Dz 380E15.1 (220Kv Hung Dong Substation) According To The Multi-Split - Multi-Connection Plan. 3. Improve The Reliability Of 35Kv, 22Kv Medium Voltage Grid Power Supply Between Dz 372E15.3 (110Kv Quy Hop Substation) And Dz 374E15.3 (110Kv Quy Hop Substation); Between Dz 472E15.17 (110Kv Hoang Mai Substation) And Dz 471Tgqx (110Kv Hoang Mai Substation); Between Dz 373E15.5 (110Kv Quynh Luu Substation) And Dz 373E15.17 (110Kv Hoang Mai Substation); Between Dz 373E15.5 (Quynh Luu 110Kv Substation) And Dz 371E15.17 (Hoang Mai 110Kv Substation); Between Dz 374E15.5 (Quynh Luu 110Kv Substation) And Dz 371E15.17 (Hoang Mai 110Kv Substation) According To The Multi-Split - Multi-Connection Plan. 4. Improve The Reliability Of The 35Kv, 22Kv Medium Voltage Grid Supply Between Dz 473E15.4 (Do Luong 110Kv Substation) And Dz 474E15.4 (Do Luong 110Kv Substation); Between Line 372E5.21 (Yen Thanh 110Kv Substation) And Line 371E5.52 (Dien Phong 110Kv Substation) After Recloser 371/04 Do Thanh According To The Multi-Split - Multi-Connection Plan