3231 Live Notices for Vietnam transportation tenders
Showing 1 to 20
Property Insurance Air Traffic Management Engineering Company Limited 2025
Cpc-Donggiang-G02: Supply And Transportation Of Conductors, Underground Cables, Optical Cables, Insulation Accessories
Maintenance And Care Work For Green Parks And Public Green Areas From March 2025 To The End Of 2027 And Maintenance And Dredging Of The Drainage System In District 5 From 2025 To 2027
Hazardous Medical Solid Waste Collection, Transportation And Treatment Services For The Period 2025-2026
Package Xl04: Construction Of Operator House, Toll Station And Turning Road (Including Survey And Design Of Construction Drawings)
Package 4: Cost Of Collection, Transportation And Service Fee Collection
Package 4: Cost Of Collection, Transportation And Service Fee Collection
Cpc-Donggiang-G01: Supply And Transportation Of Primary And Secondary Equipment, Computer Control Systems, Communications, Scada, Hmi, Technical Services And Installation Services
Ore Transport 3 Storage Warehouse Mine 14 Import Coc Mine Station
Package No. 01: Consulting On The Development Of Guidelines For The Management Of Household And Individual Solid Waste; Specific Prices For Collection, Transportation And Treatment Of Household Solid Waste In Tra Vinh Province.
Transporting Books Of Kim Dong Publishing House In 2025
Package No. 03: Management, Operation, Maintenance Of Equipment And Software Systems Serving The Issuance And Exchange Of Driving Licenses At The Hanoi Department Of Transport In 2025
Package 9: Supply And Transportation Of Steel Columns
Package No. 04: Cost Of Collection, Transportation And Service Fee Collection
Construction 1 - Dredging And Solidifying Ap Tinh Canal
Package No. 04: Maintenance Of The Maritime Traffic Monitoring And Coordination System (Vts) In Da Nang In 2025
Collection, Transportation And Treatment Of Domestic Waste In Dong Hoa Commune In 2025
Package No. 04Xl-Scl-2025: Construction Of Dredging And Maintenance Of The Seaport And Cooling Water Channel Of Duyen Hai Power Center, Phase 1, 2025
02Xl-Cnt3-2023: Construction Of Upgrading And Renovating Wharf No. 3 Of Duyen Hai Port (Including Construction Insurance)
Collection, Transportation And Treatment Of Sludge (Phase 1)