Sa.270.1.30.2025 Construction Of The Wood Wood Turczyn Bieździedzie
School/14/2025/Bk Purchase And Delivery Of Materials And Resources For Maintenance Of Sports Equipment For 5 Jw
Storage, Treatment And Recycling Of Deches
Equipment And Material Supplies For Technical Services In The City Of Saint-Mandé
Maintenance, Renovation Or Small Construction Work By Separate State Body (Reminder Of Lot N ° 5)
Surrtri, Transfer And Transport Of Wood From Waste
Rehabilitation Works Of The Municipal Swimming Pool Of "Vineyards Benettes".
Maintenance And Major Repairs For Ght Lorraine Nord And Health Cooperation Groups
Work Framework Agreement, Repair Maintenance Or Improvement In Buildings For The Period 2025-2029
Supply And Delivery Of Raw Wood For The Needs Of Maintenance Teams Of The Grand Maritime Port Of Nantes St-Nazaire
Creation Of A Wooden Boiler And A Network Of Heat For The Town Of Montoison (26)
Acquisition Of Library Elements
Acquisition Of Hardware
Nwssp Supply Chain Pallet Collection
Cwf Lot 2A - Reconstruction Of Scrithwaite Wood Retaining Wall
Parties A - Statics: Construction Of A School Building In Wood Construction (Building E) The Building Is To Be Designed In Skeletal Construction. Kind Data: 107 M³ Of Bars And Supports Made Of Board Perrwood 259 M³ Of Wooden Ceilings Made Of Board Wood 1,050 M² Ceilings In The Form Of Hollow Box Elements Construction Of A Technology Floor (Building B) The Technical Floor Is To Be Built On A Reinforced Concrete Structure. Parties B- Technology: Delivery And Laying Of +/- 345 M Ict Tube Delivery And Laying Of +/- 60 M Hdpe Tube With Insulation Game C- Architecture: Roughly 1500 M² Flat Roof Sealing Work With Epdm Foils Approx. 1400 M² Roof Greening Approx. 235 M Rope Protection System Approx. 1,200 M² Rear-Ventilated Facade With Blow-In Insulation And Wooden Slats Approx. 260 M² Wooden Facade (Not Insulated) On Technology Boxes Approx. 60 M² Wood Covering On Loggia And Balcony Approx. 20 M Glass Railing On Loggia And Balcony Approx. 70 M² Etics On Ceiling Surfaces Approx. 70 M² Outdoor Plaster 2-3 Mm Approx. 22 Pieces Post-Bar Elements Wood-Aluminum With Approx. 3-11 Pieces Of Parietal Window And Fixed Glazing Approx. 5 Pieces Of Post-Bar Elements Wood-Aluminum With Fixed Glazing 26 Pieces Of Offshore Systems For Window Elements Approx. 3 Pieces Of Post-Bar Elements Wood-Aluminum Input Situation With Outer Door Elements Approx. Holz-Alu Approx. 8 Pieces Of Facade Ventilation Grille Alu Begin / Duration Of Work: March 2026/145 Working Days
Departmental Heritage, Maintenance Work And Major Repairs 2025-2028
Implementation Fire Protection Concept Thuringian Community School Bridge School - Carpentry Work
General Entrepreneurship For The Construction Of A New Family House, At The Müllerwäldchen In Mainz-Gonsenheim, Voek 632-24
Bger Hin L 13602 L Bkp 273.2 Inner Glazing Made Of Wood