Summary:
Bidding for construction work to renovate the Premium Lounge waiting hall on Floor B, Sriwetchawat Building, 1 item, by electronic bidding (e-bidding) Country:
Thailand
Notice Type:
Procurement Plan Deadline:
28 Oct 2025 Posting Date:
05 Nov 2024 |
Summary:
Bidding For Construction Work, Contract To Install Electrical Lighting, Height 9.00 M. (Mounting Height), Tapered Steel Pole Single Bracket With High Pressure Sodium Lamp 250 Watts, Cut - Off Roadway Lighting, Complete With Complete Equipment, As Well As Various Fees To Use. The Work Can Be Done According To The Standards Of The Department Of Highways, Highway 2417 C.S.0100, Na Phra Chai - Seka Section Between Km. 33+150? Km. 36+500 (Intermittently) Work Quantity 1 Site (Work Quantity 68 Trees) By Electronic Bidding Method. Country:
Thailand Estimated Cost:
THB 3469000 Notice Type:
Procurement Plan Deadline:
29 Mar 2025 Posting Date:
30 Mar 2024 |
Summary:
Bidding For Construction Work, Contract To Install Electrical Lighting, Height 9.00 M. (Mounting Height), Tapered Steel Pole Single Bracket With High Pressure Sodium Lamp 250 Watts, Cut - Off Roadway Lighting, Complete With Complete Equipment, As Well As Various Fees To Use. The Work Can Be Done According To The Standard Model Of The Department Of Highways, Highway 2177 C.S.0100, Sri Songkhram - Na Noi Section 2, Between Km. 0+303 - Km. 26+095 (Intermittently), Work Quantity 1 Site (Work Quantity 81 Trees) By Means Of Electronic Bidding. Country:
Thailand Estimated Cost:
THB 4500000 Notice Type:
Procurement Plan Deadline:
29 Mar 2025 Posting Date:
30 Mar 2024 |
Summary:
Bidding For Construction Work, Contract To Install Electrical Lighting, Height 9.00 M., Lamp Size 250 Watts (Mounting Height), Tapered Steel Pole Double Bracket With High Pressure Sodium Lamp 250 Watts, Cut-Off Roadway Lighting With Complete Equipment As Well As Various Fees Are Available According To The Standard Form Of The Department Of Highways, Highway 212 C.S.0303, Tha Khwai-Klang Noi Section, Section 5, Between Km. 335+005-Km. 339+630 (Intermittently), Workload 1 Location (Workload 95 Trees) By Electronic Bidding Method Country:
Thailand Estimated Cost:
THB 6305000 Notice Type:
Procurement Plan Deadline:
29 Mar 2025 Posting Date:
30 Mar 2024 |
Summary:
Bidding For Construction Work, Contract To Install Electrical Lighting, Height 9.00 M. (Mounting Height), Tapered Steel Pole Single Bracket With High Pressure Sodium Lamp 250 Watts, Cut - Off Roadway Lighting, Complete With Complete Equipment, As Well As Various Fees To Use. The Work Can Be Done According To The Department Of Highways Standard, Highway 2031 C.S.0100, That Noi Section? Na Nuea Between Km.17+365? Km.22+675 (Intermittently) Work Quantity 1 Site (Work Quantity 31 Trees) By Electronic Bidding Method Country:
Thailand Estimated Cost:
THB 1834000 Notice Type:
Procurement Plan Deadline:
29 Mar 2025 Posting Date:
30 Mar 2024 |
Summary:
Bidding For Construction Work, Contract To Install Electrical Lighting, Height 9.00 M. (Mounting Height), Tapered Steel Pole Single Bracket With High Pressure Sodium Lamp 250 Watts, Cut - Off Roadway Lighting, Complete With Complete Equipment, As Well As Various Fees To Use. Work Can Be Done According To Department Of Highways Standards. Highway No. 2033, Control Section 0102, Na Nuea - Kham Phok Section, Section 2 Between Km. 33+813 - Km. 35+073 (Intermittently), Work Quantity 1 Site (Work Quantity 36 Trees) By Electronic Bidding Method. Country:
Thailand Estimated Cost:
THB 1829000 Notice Type:
Procurement Plan Deadline:
27 Mar 2025 Posting Date:
28 Mar 2024 |
Summary:
Bidding For Construction Work, Contract To Install Electrical Lighting, Height 9.00 M. (Mounting Height), Tapered Steel Pole Single Bracket With High Pressure Sodium Lamp 250 Watts, Cut - Off Roadway Lighting, Complete With Complete Equipment, As Well As Various Fees To Use. The Work Can Be Done According To The Department Of Highways Standard, Highway 2185 C.S.0200, Khok Sa-At - Na Wa Section 2, Between Km. 9+965 - Km. 16+755 (Intermittently), Work Quantity 1 Site (Work Quantity 63 Trees) By Bidding Method. Electronics Country:
Thailand Estimated Cost:
THB 3497000 Notice Type:
Procurement Plan Deadline:
27 Mar 2025 Posting Date:
28 Mar 2024 |