Similar tenders from other countries.
Showing 1 to 20
State Road 4 (E67) Tallinn-Pärnu-Ikla Km 108.5-115,827 (Up To Pk 1154+00) Are Other Section 2+2 Road Construction
31142566/31142564: Performance Contract Droog Rws Mn Districts North And South
D6 Žalmanov - Knínice - Od No. 11
Replacement New Levensauer Hochbrücke Los 8_Demontage And Assembly Superstructure
General Services Administration (Gsa) Seeks To Lease The Following Space: 3Tx1200_1
Earth Work, Construction Of Flexible Pavement, Rcc Box Culvert (15 Nos), Drain And Protective Work From 49Th (P) Km (Ch.48+600M) To 53Th (P) (Ch.52+125M) Km Of Bhulta-Araihazar-Bancharampur-Nabinagar-Shibpur-Radhika R-203, (Korikandi To Bancharamp.
Earth Work, Construction Of Flexible Pavement, Rcc Box Culvert (11 Nos) & Bridge (1 Nos), Drain And Protective Work From 41St (P) Km (Ch.40+280M) To 49Th (P) (Ch.48+600M) Km Of Bhulta-Araihazar-Bancharampur-Nabinagar-Shibpur-Radhika R-203, (Ko.
Package No. 02: Construction Construction
Hinesburg-South Burlington Stp Ps25 (8)
Essex-Fairfax Stp Fpav (85)
Design And Execution "Dn 73 C, Km 44+800 - Km 55+000, Court Of Arges - Tigveni" (Lot 1)
Mechanical And Electrical Engineering Construction Of National Highway 108, Mentougou District
Construction Of The Third Phase Of The Road Project Of National Highway 108, Mentougou District
Construction Of Ancillary Buildings For The Third Phase Of National Highway 108, Mentougou District
Construction Of Traffic Engineering Of The Third Phase Of National Highway 108, Mentougou District
Tnd0022747 - Asphalt Concrete Pavement, Crack Repair, Milled Rumble Strips, Pavement Markings, Highway Line Painting And Other Work
Object: Electronic Auction - Acquisition Of Tires And Batteries For Lower Price Per Item, In Price Registration System, In Order To Meet The Administrative And Vegetative Life Demands Of The 8Th Construction Engineering Battalion
Construction Of Rcc Drain With Protective Work At 43Th(P), 44Th(P) & 45Th(P) Km Of Feni-Noakhali National Highway (N-104) Under Noakhali Road Division During The Year 2024-2025.
Package No. 19: Construction Of Road Works Connecting Provincial Road 163 With Noi Bai - Lao Cai Highway (Item: 02 Branch Routes)
D1 0136 Říkovice-Přerov