383 Live Notices for Vietnam Bridges Tenders
Showing 1 to 20
Renovating And Treating Environmental Pollution In The Area Under Ba Hu Bridge, Phu Hoa 1 And Phu Hoa 2 Villages
Repairing Damaged Roadbed And Surface In The Following Sections: Km55+150 - Km55+865, Km56+643 - Km57+103, Km57+318 - Km57+481, Km58+150 - Km58+733, Km64+100 - Km64+350, Km67+000 - Km67+422, Km67+900 - Km68+317, Km68+700 - Km69+077, Km72+253 - Km72+837, Km74+000 - Km74+500; Repairing Drainage Systems Of The Following Sections: Km61+600 - Km62+300, Km62+900 - Km63+220, Km69+200 - Km69+600, Km70+000 - Km70+350, Km73+500 - Km73+700, Km74+200 - Km74+700, Km74+850 - Km75+500; Repairing Expansion Joints Of 05 Bridges; Repair And Reinforce The Shoulder Of The Sections: Km54+350 - Km54+600, Km67+800 - Km68+100, Km72+450 - Km72+650, Km72+800 - Km73+100, Km73+500 - Km73+700 And Repair The Traffic Safety System From Km54+350 - Km75+500, National Highway 55, Binh Thuan Province
Construction Of Kenh Ngang Hoa Dong Bridge - Bordering Long Dien Commune
Contractor Selection Plan (Phase 3) For The Project Implementation Phase: Construction Of Kim Lien - Kim Tan Bridge And Access Roads At Both Ends Of The Bridge On The Kim Luong - Lien Hoa District Road, Kim Thanh District
Contractor Selection Plan Package: Consulting Survey, Preparing Economic - Technical Report Project: Repairing Damaged Ban Rien Bridge Km142+730, Mieng Bridge Km165+085, Na Meo Bridge Km177+930, Va Riec Bridge Km211+970, Ta Sa Bridge Km221+670, Ban Phan Bridge Km246+960, National Highway 34, Cao Bang Province
Plan For Selecting Contractors For Project Preparation Packages: Moving Medium And Low Voltage Lines To Serve Site Clearance For The Investment Project To Build The New Cay Bridge Approach Road And The 33M Extended Road (Through Cam Giang District) Connecting Vu Cong Dan Road, Hai Duong City
Construction Of 30/4 Bridge (Item: Construction Of Approach Roads And Bridge Railings)
Locally Repair Damaged Road Surface At Km9+290 - Km13+500; Repair Corrugated Iron Guardrails, Convex Mirrors At Curved Locations, Signs, Markers, And Reflective Studs At Km0+00 - Km22+00; Km162+00 - Km210+00; Supplement And Complete The Traffic Safety System On The National Highway Through Schools At Km0+350, Km92+070, Km101+200, Km111+750, Km146+550, Km178+600, Km208+00; Reinforce Landslides At Km81+690; Repair The Tan Ly Bridge Cone At Km129+447; Repair Culverts At Km65+430, Ho Chi Minh Road (West Branch), Quang Binh And Quang Tri Provinces
Upgrading And Expanding Long Chao Route (From Thanh Nien Bridge To Pham Thanh Hao'S House) Cai Tram B Hamlet
Contractor Selection Plan For The Project: Maintenance And Repair Of Embankment To Protect Rice Fields From Ban Giang Bridge To Ban Noong Hang Bridge, Ang Cang Commune, Muong Ang District
Repairing The Lighting System Of Long An Commune (Tan An Bridge Approach Road From Long Phu To Tan An Bridge And Long An Chau Phong Road From Kenh Dao Bridge To Tan An Bridge)
Project: Truc 1 Canal. Items: Dredging Of Congested Areas Before And After Bridges Across The Canal; Building Canal Banks At Landslide Areas, Cutting Trees, Clearing The Ground.
Repair And Troubleshoot Camera System At Lang Ha - Thai Ha Intersection, Trung Hoa Bridge, Lang - Lang Ha
Installing Solar Lights On Mac Dinh Chi Bridge Approach, Ward 4, Soc Trang City
Consulting On Survey, Preparing Economic - Technical Report On Investment In Construction Of The Project Repairing Road Surface, Drainage Ditches From Km408+00 ÷ Km410 And Repairing Expansion Joints Of Bridges: Tung Coc Km385+484; Dong But Km397+500; Chen Ren Km399+627; Khe Chet Km399+798; Banh Ran Km400+073; Cay Ngai Km401+012; Cay Buoi Km402+858, National Highway 15, Ha Tinh Province
Repairing The Drainage System Along The Section Km1859 – Km1861+060 (T); Repairing Damaged Amata Overpass (Km1865+817), Suoi Linh Bridge (Km1866+530), Tam Hiep Underpass (Km1866+750 – Km1867+210), Vung Tau Crossroads Underpass (Km0+298 Ql51 – Km1871+668 Ql1); Handling To Ensure Traffic Safety In School Areas At Km1856+602, Km1862+900, Km1862+1170, Km1864+175 Ql1; Adjusting The Traffic Safety System According To Qcvn 41:2019/Bgtvt Standards For Sections Km1865+240 - Km1873+275 Ql1 And Km0-Km0+842 Ql51, National Highway 1, Dong Nai Province
Consulting On Survey And Preparation Of Feasibility Study Report For Construction Investment: Repairing Damaged Road Surface And Completing Traffic Safety System At Section Km1+800 ÷ Km2+080; Km22+580 ÷ Km24+00; Km24+900 ÷ Km26; Km44+950 ÷ Km45+150; Km48+00 ÷ Km48+200 And Repairing Expansion Joints Of Thach Son Bridge; Repairing Bridge Piers And Girders Of Cua Nhuong Bridge, Ql.15B
Dvci: Tree Care, Environmental Sanitation In Tien Du District Administrative Center, Lim Hill, Hoai Thuong Bridge Intersection, Hl4 Road, Dt1 Road, Hong An Road Phase 2024-2025
Dredging Combined With Embankment Construction On The West Bank Of Canal 13 (From Dt844 - Bordering Phuong Thinh) + Bridge
Repairing My Thuan Bridge Deck Km2027+366 – Km2028+900, Repairing Foundation, Road Surface And Completing Traffic Safety System Of Branches In The Intersection On The South Bank Of My Thuan Bridge: Double Bridge Branch Ql80 To Vinh Long, Vinh Long Branch To Double Bridge Ql80, Overpass Bridge Branch To My Thuan Bridge, Overpass Bridge To Double Bridge Ql80 And Parallel Road Surface Of My Thuan Bridge From Km2025+360 – Km2027+400, Km2028+700 – Km2029+600, National Highway 1, Tien Giang – Vinh Long Province