12442 Live Notices for Vietnam Consultancy Tenders
Showing 1 to 20
Survey, Design Bvtc-Estimate
Consulting Supervision
Package 04: Consulting On Auditing Capital For Project Completion
Package No. 06: Construction Supervision, Equipment Installation, Fire Prevention
Package No. 2: Non-Consulting: Providing Services Of Sweeping - Collecting Garbage, Transporting Domestic Solid Waste In Binh Thanh District From 2025 To 2027
Consulting And Supervising The Construction Of Non-Electrical And Telecommunications Parts For The Project "Underground Power Grid On Le Khoi - Nguyen Ly - To Hieu Street, Tan Phu District"
Preliminary Design
Tv9 Package: Consulting On Technical Design Review And Estimate Review
Approval Of The Contractor Selection Plan For The Project: Historical Relic Of Tam Ky Town Party Committee Base During The Resistance War Against America To Save The Country, Period 1971-1975
Notice Of Extension: In-Water Survey Of Dragon Gas Compression Platform, Riser Pipe Section 10” Rp3, Riser Pipe Section 10” Rc1
Tv8 Package: Consulting And Supervising The Survey Work Of Technical Design Step
Package No. 33: Supervision Consultancy Package No. 31: Construction Of Traffic Monitoring And Control System (Excluding Equipment Supply And Installation)
Package No. 22: Supervision Consultancy Package No. 19: Construction Of Traffic Monitoring And Control System (Excluding Equipment Supply And Installation)
Package 02: Consulting On Land Use Planning For 2025
Construction Supervision Consultancy And Equipment Installation
Package No. 63: Construction Supervision Of Construction Package No. 12
Package 01: Consulting On Survey, Construction Design Implementation After Basic Design And Construction Estimate
Package No. 16: Survey, Design Construction Drawings And Construction Estimates For The Project Of Embankment Combined With Internal Road Of Cai Son Lon River, Bung Binh Canal; Cai Son Lon Open Culvert, An Hung Temple; Restoration Of Technical Infrastructure Of Water Supply System; Ensuring Safety Of Waterway Traffic Serving Construction Works.
Package No. 5: Survey, Design Construction Drawings And Construction Estimates For The Project Of Dredging Combined With Zoning Embankment: Cai Son; Dredging Combined With Zoning Embankment Of Level Ii Canals: Rach Rung, Xeo Cao; 03 Open Culverts: Rach Rung, Xeo Cao 1, Xeo Cao 2; Restoring Technical Infrastructure Of Water Supply System; Ensuring Waterway Traffic Safety For Construction Works
Construction Supervision Consultancy