115 Live Notices for Vietnam Coal Tenders
Showing 1 to 20
Selecting A Supplier Package 01: Transportation Services And Coal Transportation Support Services From Khuyen Luong Port To Van Dien Fused Phosphate Plant In 2025
Collecting And Dredging Coal And Limestone From Cargo Holds Of Transshipment Ships And Cleaning The Coal And Limestone Wharf Area To Serve The Commercial Operation Of Song Hau 1 Thermal Power Plant In 2024-2025.
Contractor Selection Plan Package: Environmental Monitoring In 2025
Contractor Selection Plan For The Project Of Improving Transportation Capacity To Serve Inclined Well Production - Vang Danh Coal Joint Stock Company - Vinacomin
Bidding Plan For The Estimate: Transporting Coal By Waterway From Ports In Bac Ninh And Bac Giang Areas To Pha Lai Thermal Power Joint Stock Company Port In 2025
Supplier Selection Plan Supply Package: Hire For Hazardous Waste Treatment, Regular Industrial Waste In 2025 - Ha Lam Coal Joint Stock Company - Vinacomin
Transporting Undersized Lump Coal From Coal Gasification Workshop To B-02 Coal Warehouse In 2025-2027
74Dh-Sxkd-2024: Providing Periodic Maintenance And Calibration Services For Coal Feeders For Duyen Hai 3 Thermal Power Plant Expansion
Implementing The In-Kind Compensation Regime For Employees Working In Conditions With Dangerous And Harmful Factors At Dak Nong Aluminum Company - Tkv In 2025-2027
Collecting And Dredging Coal And Limestone From Cargo Holds Of Transshipment Ships And Cleaning The Coal And Limestone Wharf Area To Serve The Commercial Operation Of Song Hau 1 Thermal Power Plant In 2024-2025.
Khlcnt Project: Investment In Coal Yard Cover House With Site Incident +16
Contractor Selection Plan For The Investment Project To Upgrade And Renovate The No. 3 Coal Import Port Of Duyen Hai Power Center
Hire The Tunnel Excavation Stage To Prepare For Production In Area V6A At Level +50/+100 T.I-:-Rg And Area V7T At Level +30/+125 T.V-:-F.305 (Phase 1)
Plan To Select Contractors For The Project Of Investing In Conveyor Systems And Hoists To Serve Production At Levels -175/-300 Of Nga Hai Coal Mine
Approval Of Estimates And Technical Plans For Renting Automobile Equipment, Wheel Excavators, Generators, Coal Crushers (Gt04)
Approval Of The Estimate And Plan For Selecting Contractors To Rent Loading And Transport Equipment To Serve Stcb, Collect, Blend, Consume And Transport Coal From Industrial Mine Warehouses Of Units To Port Warehouses In 2025 (Gt02)
Approval Of The Budget And Plan For Selecting Contractors For Renting Water Vehicles For Internal Coal Transportation In 2025 (Gt01)
Bidding Plan For The Estimate: Transporting Coal By Waterway From Ports In Bac Ninh And Bac Giang Areas To Pha Lai Thermal Power Joint Stock Company Port In 2025
And Contractor Selection Plan (Package No. 01-2025) Estimates The Purchase Of Special Car Tires For Production In The First And Second Quarters Of 2025, Tire Type 27.00R49
Lcnt Plan For Environmental Treatment And Improvement, Dust Prevention Of Ground Level In Pxvt1 Area