105 Live Notices for Vietnam Fencing Wire Tenders
Showing 1 to 20
Package 03-2025: Electric Wires And Cables Of All Kinds
Package 9: Supply And Transportation Of Steel Columns
Medium Voltage Fuse Wire And Underground Cable Head
Package 10-2025: 4G Modem
Package 09-2025: Information Technology Telecommunications Equipment
Package 07-2025: Meter Box, Wire Splitter Box
Package No. 14: Construction Of Mine And Explosive Clearance
5Hh-Dz500Lc: Supply Steel Poles And Construct And Install Power Lines From Vt200 To Vt242
9Hh-Dz500Lc: Supply Steel Poles And Construct And Install Power Lines From Vt380 To Vt428
Package 01-2025: Circuit Breakers, Measuring Equipment, Lightning Arresters, Switching Equipment
10Hh-Dz500Lc: Supplying Steel Poles And Constructing And Installing Lines From Vt428 To 500Kv Vinh Yen Substation
Package 11-2025: Supply Of Fuel For Vehicles
Purchase Of Sealing Wire, Lead Seal, Steel Beam, Strut, Stop Clamp, Hanging Clamp And Accessories Of All Kinds In 2025
Contractor Selection Plan (Investment Preparation Phase)Consulting Package For Survey And Preparation Of Technical Economic Report No. 01 Dtxd 2026-Tvkstk Of The Project: "Installing Lightning Protection Wires On Medium Voltage Lines After 110Kv Station E10.6"
Contractor Selection Plan For The Package: Repairing Barbed Wire Fences On The Southern Boundary Line And Installing New Power Lines For Forest Protection Station No. 3
Purchasing Lighting And Electrical Wire Supplies To Decorate The District Administrative Center To Welcome The Lunar New Year 2025
Lighting System Of District Road 38 (Section From District Road 39B To Steel Wire Road)
Repair Of Gastric Endoscope Wire For Professional Service In 2025
Item: Repairing Lightning Protection Wires Damaged By The Impact Of Storm No. 3 (Yagi) In 2024 At Anchorage Vt43-Vt51 And Pole Intervals Vt74-Vt85 Belonging To Anchorage Vt74-Vt88 Of 500Kv Line 573 Quang Ninh (T500Qn) - 586 Hiep Hoa (T500Hh), Category: 500Kv Line Quang Ninh - Hiep Hoa, Funding Source: Major Repair In 2025
Contractor Selection Plan. Project: Replace Bare Wire With Covered Wire On Xuan Lap Branch, Line 477 Long Giao (Section From Pillar 477Lg-012/074 To Pillar 477Lg-012/074/012) – Scl 2025