Toggle Offcanvas
...
 
Global Vietnam Power Plant Construction Tenders

Vietnam Power Plant Construction Tenders

Bid on readily available Vietnam Power Plant Construction Tenders with GlobalTenders, the biggest and best online tendering platform, since 2002. Globaltenders.com offers an unmatched database of Power Plant Construction tenders from Vietnam, more than any other platform. Daily, new procurement opportunities for Power Plant Construction are uploaded from thousands of sources including all Vietnamese official websites, Vietnamese municipal websites, Vietnamese newspapers and journals.

Bidding for Power Plant Construction tenders in Vietnam is extremely lucrative for companies of all sizes. Vietnam tendering authorities release contracts for most of the Power Plant Construction products and services procured by them. The most popular categories are -

  • Vietnam power plant construction tenders
Sign up to get instant access to unlimited Vietnam Power Plant Construction Tenders with advanced search filters, market analysis, industry trends, tender training and 24/7 customer support. Vietnam Power Plant Construction market analysis, Vietnam Power Plant Construction industry trends, Vietnam Power Plant Construction tender training and 24/7 customer support.

12 Live Notices for Vietnam Power Plant Construction Tenders

Showing 1 to 12

(1) Ground And Drainage System Of Ham Tan Power Company, Fence And Leveling Of Tan Minh Power Plant, Concrete Road To Tan Thang Power Plant - Ham Tan Power Company; (2) Construction Of Guard Stations At 110Kv Stations: Phan Ri, Mui Ne, Ham Kiem, Ma Lam, Song Binh, Thang Hai, Van My
country Vietnam
posting date25 Nov 2024
deadline10 Dec 2024
Package No. 15: Construction Of Roads, Rainwater Drainage, Wastewater Drainage (Including Remaining Work, Excluding Un-Cleared Area) Tre Nga Area, Vuon Cau
country Vietnam
posting date15 Nov 2024
deadline03 Dec 2024
Package No. 16: Construction Of Roads, Rainwater Drainage, Wastewater Drainage (Including Remaining Work, Excluding Un-Cleared Area) In Pho Huyen Area
country Vietnam
posting date15 Nov 2024
deadline03 Dec 2024
Package No. 07/2024/Xl-Cj: Repair And Maintenance Of Construction Items - Cu Jut Solar Power Plant
country Vietnam
posting date13 Nov 2024
deadline12 Nov 2025
(1) Ground And Drainage System Of Ham Tan Power Company, Fence And Leveling Of Tan Minh Power Plant, Concrete Road To Tan Thang Power Plant - Ham Tan Power Company; (2) Construction Of Guard Stations At 110Kv Stations: Phan Ri, Mui Ne, Ham Kiem, Ma Lam, Song Binh, Thang Hai, Van My
country Vietnam
posting date21 Oct 2024
deadline21 Oct 2025
Contractor selection plan (phase 1) package No. 03 (TV-03) "Consulting on preparing bidding documents for the package Design, supply of technological equipment and construction of fuel conversion project for O Mon I Thermal Power Plant using Lot B gas"
country Vietnam
posting date17 Oct 2024
deadline16 Oct 2025
Plan To Select Contractors For The Items Of Repairing The Retaining Wall Of The Negative Slope Of The 220Kv Distribution Station; Repairing The Oil-Mixed Water Treatment Station (Construction Part) Of Se San 4 Hydropower Plant And Repairing And Reinforcing The Curb And Slope Of The Internal Operating Road Of Se San 4 Solar Power Plant
country Vietnam
posting date28 Sep 2024
deadline27 Sep 2025
Plan To Select Additional Contractors For The Project To Raise The 500Kv Power Transmission Line From Nghi Son 2 Thermal Power Plant To Nho Quan At The Intersection Of National Highway 12B, Part Of The East-West Road Construction Investment Project, Ninh Binh Province (Phase I)
country Vietnam
posting date17 Sep 2024
deadline16 Sep 2025
Contractor Selection Plan For Investment Preparation Phase Project: Moving 110Kv Line 176 A80 Pha Lai Thermal Power Plant - 172E8.1 Dong Nien And 172E8.24 Nam Sach - 171E8.1 Dong Nien To Serve Site Clearance For The Project: Construction Of A New Residential Area In Nam Khe Village, Hong Phong Commune, Nam Sach District (First Time)
country Vietnam
posting date15 Aug 2024
deadline15 Aug 2025
Plan For Selecting A General Contractor For The Package Of Consulting On Construction Survey And Preparation Of Construction Investment Technical Report Under The Project To Overcome Existing Problems In Fire Prevention And Fighting For Loc Phat Hydropower Plant And Ankoroet Hydropower Plant Project To Overcome Existing Problems In Fire Prevention And Fighting For The Operator 175 3/2 Street, Da Lat City Project To Overcome Existing Problems In Fire Prevention And Fighting For Bao Loc Power Operator
country Vietnam
posting date06 Aug 2024
deadline06 Aug 2025
Consulting On Preparing Survey Reports, Design And Construction Documents To Replace Boiler Pressure Pipe Systems For 04 Units Of Hai Phong I&Ii Thermal Power Plant
country Vietnam
posting date24 Jul 2024
deadline24 Jul 2025
Consulting On Verification Of Survey Reports, Design And Construction Documents To Replace Boiler Pressure Pipe Systems For 04 Units Of Hai Phong I&Ii Thermal Power Plant
country Vietnam
posting date24 Jul 2024
deadline24 Jul 2025

Share Share this page