35 Live Notices for Vietnam Traffic Management Tenders
Showing 1 to 20
Repair Works
Construction Supervision
Repair Signs; Supplementing The Reflective Nail Of The Road; Repair And Supplementation Of Lan Ton Waves From Km313+800 - Km340+300, Km345+200 - Km412+500; Supplementing The Traffic Safety System Of Schools Close To The National Highway Km327+410 (P), Km327+500 (T), Km328+053 (T), Km328+066 (P), Km331+767 (T), Km334+758 ( T), Km338+238 (T), Km339+389 (T), Km339+440 (P), Km344+350 (T), Km344+984+ (P), Km347+914 (P), Km349+420 (P), Km355+200 (T), Km360+164 (T), Km362+713 (P), Km363+134 (T), Km370+311 ( T), Ho Chi Minh Road (West Branch), Thua Thien Hue Province
The Contractor Selection Plan To Implement The Task Of Verifying The Task And Estimates; Appraisal Of Contractor Selection Planning Planning Package For Renting Service Service Services Smart Transport System Phase 1 In Hanoi City
Repairing The Background, Road Surface And Completing The Traffic Safety System Of Km19 - Km20, Km29 - Km32; Repair Hoa Long Bridge Surface Km29+484, Repair The Bridge And The Bridge Surface Of Ba Phu Km22+547, Highway 80, Dong Thap Province
Repair Damage To Background, Road Surface, Drainage Ditch And Traffic Safety System Km70+500 - Km71+534, Km72+892 - Km73+300, Km73+539 - Km75+100, Km79+350 - Km79+600, Km79 +770 - Km80+450, Km80+700 - Km81+00, Km83+900 - Km84+100, Km87+050 - Km87+700, Km90+680 - Km91+400, Km92+450 - Km92+700; Repairing Drainage Ditches Of Km70+895 - Km70+985 (P); Repairing The Marm30+308 Slot Bridge, Khe Bloom Bridge Km38+828, Ra Bua Bridge Km40+855, Mai Lau Bridge Km56+076, Viabele 1 Km61+093, Ba Tam Bridge Km66+280; Strengthen Traffic Safety System Through Schools Through The School Paragraph Km32+400 - Km94+780, Highway 12C, Ha Tinh And Quang Binh Provinces
Repairing And Strengthening Traffic Safety Systems According To Qcvn 41: 2019/Bgtvt Section Km20+590-Km174+752, Additional Traffic Lights At Quy Hau Intersection Km162+060 Ql.10, Tp. Hai Phong, Thai Binh And Nam Dinh Province (In Addition To The Road Repair Routes Combined With Additional Traffic Safety System)
Repair Bridges: Resistance Km2316+353, Stone Dam 2 Km2318+826, Bottle Km2322+248, Tower Ten Km2300+252; Repairing Traffic Safety System According To Qcvn 41: 2019/Bgtvt And Handling To Ensure Traffic Safety In The School Area Of Km2300 - Km2323+417, Ho Chi Minh Street, Dong Thap Province
Repairing The Drainage System Along The Section Km1859 - Km1861+060 (T); Repairing Damaged Amata Overpass (Km1865+817), Suoi Linh Bridge (Km1866+530), Tam Hiep Underpass (Km1866+750 - Km1867+210), Vung Tau Crossroads Underpass (Km0+298 Ql51 - Km1871+668 Ql1); Handling To Ensure Traffic Safety In School Areas At Km1856+602, Km1862+900, Km1862+1170, Km1864+175 Ql1; Adjusting The Traffic Safety System According To Qcvn 41:2019/Bgtvt Standards For Sections Km1865+240 - Km1873+275, National Highway 1 And Km0 - Km0+842, National Highway 51, Dong Nai Province
Repairing The Road Surface At Km12+182 – Km13+700; Repairing Longitudinal Grooves At Km12+280 – Km12+470 (P); Repairing And Strengthening The Traffic Safety System At Km12+185 – Km18 Of Hai Van – Tuy Loan Tunnel, Da Nang City
Repairing Roadbed And Surface, Completing Traffic Safety System At Km2+700 - Km4+720, Km5+300 - Km5+780, Km17+600 - Km18+400; Repairing Drainage System At Km17+600 - Km18+350 (T, P), National Highway 53B, Tra Vinh Province
Repairing My Thuan Bridge Deck At Km2027+366 - Km2028+900; Repairing The Foundation, Road Surface And Completing The Traffic Safety System Of The Branches In The Intersection On The South Bank Of My Thuan Bridge: Double Bridge Branch Of Ql80 To Vinh Long, Vinh Long Branch To Double Bridge Of Ql80, Overpass Bridge Branch To My Thuan Bridge, Overpass Bridge To Double Bridge Of Ql80 And The Parallel Road Surface Of My Thuan Bridge From Km2025+360 - Km2027+400, Km2028+700 - Km2029+600, National Highway 1, Tien Giang And Vinh Long Provinces.
Contractor Selection Plan For The Project Of Repairing Damaged Roadbed And Surface; Drainage System And Completing Traffic Safety System Of Sections Km88+900-Km91+300, Km92+150 - Km93+150, National Highway 27C, Lam Dong Province
Plan To Select Public Service Contractors: Maintain Traffic Light System In Long Khanh City In 2025
Select A Contractor To Implement A Plan To Hire Information Technology Services To Deploy An Interconnected Electronic Ticket System For Public Transport In Hanoi.
Renovating The Drainage System Combined With Traffic Routes From Ta Day Dike To Dai Thanh Bridge, Dong La Commune
Repairing Damaged Road Surface From Km81+970-Km82+050 (P), Compensating For Subsidence Of Culvert Head Road Km75+230, Km79+848, Km81+080, Km83+072; Repairing And Supplementing Traffic Safety System From Km66+500-Km90+168 On National Highway 21B, Ha Nam And Nam Dinh Provinces
Package No. 3: Construction Supervision Consultancy Under The Project: Repairing Damaged Road Surface, Drainage System And Repairing And Supplementing Traffic Safety System, Section Km244+155 - Km262+353 Dong Tuyen Commune, Cam Duong Commune/ Noi Bai - Lao Cai Expressway, Lao Cai Province
Package No. 4: Consulting On Auditing The Final Settlement Of Completed Works Under The Project: Repairing Damaged Road Surfaces, Drainage Systems And Repairing And Supplementing The Traffic Safety System In The Section Km244+155 - Km262+353 Of Dong Tuyen Commune, Cam Duong Commune/ Noi Bai - Lao Cai Expressway, Lao Cai Province
Managing And Operating The Public Lighting System, Decorative Led Lighting System, And Traffic Lights In Thai Hoa Town By 2025.