15 Live Notices for South Africa Meters Tenders
Showing 1 to 15
Category A: For The Supply And Delivery Of Materials And Components For The Fabrication, Assembly And Testing Of A 12 Meter Lowbed At Transnet Engineering Durban Ports [Once-Off]. Category B: For The Supply And Delivery Of Tools For The Fabrication, Assembly And Testing Of A 12-Meter Lowbed At Transnet Engineering Durban Ports [Once-Off].
Contractor Appointment For Replacement Of Electrical Meters, Billing Software And Maintenance Of Billing Software For A Period Of Five Years At King Shaka International Airport.
Contractor Appointment For Replacement Of Electrical Meters, Billing Software And Maintenance Of Billing Software For A Period Of Five Years At King Shaka International Airport.
Contractor Appointment For Replacement Of Electrical Meters, Billing Software And Maintenance Of Billing Software For A Period Of Five Years At King Shaka International Airport.
The Supply And Staggered Delivery Of 16000 X Split Meter With Bulkhead Readyboards And 1120 X Box Distr:6 Way Btm Entry Split Meters
Panel Of Service Providers To Supply And Install Yard Connection Meters For The Period Of 36 Months
Supply and Delivery of Smart Split Type Electricity Meters
Supply And Delivery Of Semi-Positive Rotary Piston Type Volumetric Water Meters In Meter Boxes
Supply And Delivery Of Semi-Positive Rotary Piston Type Volumetric Water Meters In Meter Boxes
Regret Letter For Unsuccessful Suppliers Teap Process For Manufacturing And Supply Of Smart Meters For All Distribution Clusters For A Period Of 3 Years On An “As And When” Required Basis
The Establishment Of An Enabling Agreement With A Maximum Panel Of 40 Contractors For The Provision Of Supervision, Labour, Equipment, Material (Except The “Big Five” Material Which Include Meters, Poles/Cross Arms, Transformers, Cable And Conductor), Transport (As It Will Be Required And Authorised) For Electrification Of New Household Connections (Above R3 000 000,00 Per Project) For A Period Of Thirty (30) Months (Twenty-Four (24) Months For Allocation Of Task Orders And Six (6) Months For The Close-Out Of Projects And Finalisation Of The Payment Process) For Distribution Division In The Kzn Operating Unit, Central East Cluster As And When Required.
The Establishment Of An Enabling Agreement With A Maximum Panel Of 40 Contractors For The Provision Of Supervision, Labour, Equipment, Material (Except The “Big Five” Material Which Include Meters, Poles/Cross Arms, Transformers, Cable And Conductor), Transport (As It Will Be Required And Authorised) For Electrification Of New Household Connections (Above R3 000 000,00 Per Project) For A Period Of Thirty (30) Months (Twenty-Four (24) Months For Allocation Of Task Orders And Six (6) Months For The Close-Out Of Projects And Finalisation Of The Payment Process) For Distribution Division In The Kzn Operating Unit, Central East Cluster As And When Required.
Installation Of Compressed Flow Meters To Process And Instrument Air Pipework For A Period Of 5 Months At Kusile Power Station
Installation Of Compressed Flow Meters To Process And Instrument Air Pipework For A Period Of 5 Months At Kusile Power Station
PROVISION OF METER READING SOFTWARE FOR KANNALAND MUNICIPALITY FOR A PERIOD OF THREE (3) YEARS