46 Live Notices for South Africa Pumps Tenders
Showing 1 to 20
Supply, delivery and off-loading of submersible grit pumps at the Waste Water Treatment Works, as and when required for a period of three years
Supply, delivery and off-loading of submersible drainage pumps at the Waste Water Treatment Works, as and when required for a period of three years
Request For The Appointment Of Service Provider To Supply And Install Four (4) Flcullent Dosing Pumps At Albasini Wtw.
Construction Of The New Sanddrift East Sewer Pump Station
Construction Of The New Sanddrift East Sewer Pump Station
Appointment Of Service Provider To Supply, Delivery, Drilling, And Installation Of 2 Borehole And Electric Pump At Duncan Village And Bisho Hydroponics Project
Publication Of Bidders - Re-Issue Of Supply And Delivery Of Various Submersible Pumps On An “As-And-When” Required Basis At Komati Power Station.
Publication Of Bidders - Re-Issue Of Supply And Delivery Of Various Submersible Pumps On An “As-And-When” Required Basis At Komati Power Station.
Request For Quotation To Supply Liquid Ring Vacuum Pump
The Tender For The Supply, Delivery And Off-Loading Of Submersible Grit Pumps At The Waste Water Treatment Works, As And When Required For A Period Of Three Years
The Tender For The Supply, Delivery And Off-Loading Of Submersible Drainage Pumps At The Waste Water Treatment Works, As And When Required For A Period Of Three Years
Request For Quotation To Supply Centrifugal Pumps
Publication Of Bidders - Re-Issue Of Supply And Delivery Of Various Submersible Pumps On An “As-And-When” Required Basis At Komati Power Station.
Request For Quotation To Supply Liquid Ring Vacuum Pump
The Tender For The Supply, Delivery And Off-Loading Of Submersible Grit Pumps At The Waste Water Treatment Works, As And When Required For A Period Of Three Years
The Tender For The Supply, Delivery And Off-Loading Of Submersible Drainage Pumps At The Waste Water Treatment Works, As And When Required For A Period Of Three Years
SUPPLY AND DELIVERY OF SELF PRIMING CENTRIFUGAL PUMPS
Unit 1-6 Main & Boiler Feed Pump Turbine (Bfpt) Condenser High Pressure Jet Washing During Various Outages, Running And Opportunity Maintenance For A Period Of Five (5) Years Based On As And When Required Basis At Lethabo Power Station.
Supply of 1 x CNC Water jet cutting machine with high-pressure water pump consumables and sludge removal system to the CSIR Pretoria Campus
Supply, Strip And Repair Of Pumps, Mechanical Equipment And Electrical Motors