Similar tenders from other countries.
Showing 1 to 20
Preparation Of Project And Estimates Of Capital Repair Work At The Scientific Research Cardiology Institute Of The Ministry Of Health Of The Republic Of Azerbaijan
"Kazimierz Odna - Reclamation Of Post -Mining Areas In The Sosnowiec Commune".
Construction At Jsw S.A. Kwk "Budryk" Of Six Cogeneration Systems Powered By Gas From The Unnamed Of The Mine
Development Of Project Documentation And Implementation Of Construction Works In The "Design And Build" Formula Of The Poiiś 5.1-15 Project "Corrosion Of The Łódź Railway Junction (Ten-T), Stage Ii, Łódźfabryczna Section-Łódź Kaliska/ Łódź Żabieniec".
Implementation Of An Investment Consisting In The Design And Construction Of A Recreation And Sports Complex In Żory As Part Of The Project Entitled: Business In Żory All The Time-Development Of Degraded Areas Of The Embankment Of The Mining Railway Line For The Developmental Purposes Of The Region
Earthmoving - Mining - Micropieux Setches For The Construction Of A 59 -Housing Building.
Development Of Project Documentation And Implementation Of Construction Works In The "Design And Build" Formula Of The Poiiś 5.1-15 Project "Corrosion Of The Łódź Railway Junction (Ten-T), Stage Ii, Łódźfabryczna Section-Łódź Kaliska/ Łódź Żabieniec".
(Re-Advertise) Alexkor Rmc Jv Requests Companies In The Refinery And Fuel Supply Industry With Required Expertise And Capability To Supply Bulk Fuel (Petrol 95 Ulp & Diesel 0.005(50Ppm) Sulphur) To Alexkor Rmc Jv Fuel Station In Alexander Bay And Muisvlak(10 Kilometers North Of Port Nolloth) For A Three (3) Year Period. Maximum Capacity Per Supply Will Be 69 000 Liters Petrol & 143 000 Liters Diesel, When Required. On Average We Are Currently Procuring Approximately 60 000 Liters Diesel(50Ppm) And 20 000 Liters Petrol(95Ulp) Respectively.
Supply Fosas Cleaning Service -Longaví
China University Of Mining And Technology (Beijing) School Of Chemical Environment And Environment - Public Tender Announcement On The Construction Of Smart Teaching System
Construction d’un bâtiment administratif au profit de la Mairie de Nobéré (Fonds Miniers) pour un montant prévisionnel de vingt-six millions neuf cent quatre-vingt-seize mille deux cents quarante-quatre (26 996 244) F CFA TTC
Sustainable Revitalization And Resocialization Of Locality Medard - Building
Waste Cleaning And Extraction Service
Grubb Construction Custody Of The Shafts 44, 48 And 238 Of The Marienberg Deposit, North-East Part Of The Mining Field In Wolkenstein And Großückerswalde; Mining And Civil Engineering Renovation At 24 Damaged Areas
Rfq- Supervision Of Road Distortions Processing Works
Carrying out mining operations, including underground mining operations in the Bab Nizo mine. Carrying out mining operations, including underground mining operations in Block K of the Pabadana Mine. Carrying out mining operations, including underground mining operations in Block F of the Pabadana Mine. Carrying out mining operations, including underground mining operations and advancing Block D of the Pabadana mine. Carrying out mining operations, including underground mining operations and advancing Block C of the Pabadana mine. Carrying out mining operations, including underground mining operations in the North Abnil mine.
Fy 25 Orv Ramp Sand And Clay Order
Repair Work, Maintenance, Improvement, Rehabilitation And Construction Of Cliff Protective Works And Stones Protection Devices For The Dr. Thonon Drill.
Public Tender Announcement Of The Construction Project Of Intelligent Drilling Test Bench For The Special Technical Exploration Center Of The China Coal Geology Administration In 2025 Geological Exploration Capacity Construction Mine Drilling Rescue Laboratory Intelligent Drilling Test Bench
Earthmoving - Mining - Micropieux Sets For The Construction Of A Building Of 59 Dwellings